When a box arrives in the system, its only possible action is to enter the Entry Funnel (RR_InputBuffer). At this point, the ON_REST procedure is triggered, evaluating the situation under three logical scenarios:
Admission Scenarios
-
Queue Waiting: If the box is not the only one in the funnel (
IN > 1), it remains asleep. It does nothing else; the box ahead of it will be responsible for managing the flow when it moves forward. -
Immediate Entry: If there is enough free space on the conveyor (validated against
RR_EntryLimit), the box wakes up immediately, atomically consumes the available space, and transitions to the next state (RR_Conveyor). -
Constraint Calculation: If there is not enough space, the Virtual Entity
RR_EntryTimeoutis scheduled. This event represents the next known reevaluation of the geometric constraint. It does not search for an entry opportunity; instead, it identifies the exact moment when the constraint might no longer be valid.
In other words: when does it try to enter again? That calculation is left to the timeout.
Example
PROCEDURE RR_InputBuffer
if (R$(RR_InputBuffer,IN)>1)
terminate_ve
endif
; entity may enter conveyor immediately
if (X$RR_EntryLimit >= P$(RR_Length,P$ENTITYNUMBER) * 0.5 + X$RR_Gap)
; input ownership consumed atomically
savevalue RR_EntryLimit,0
;timeout RR_Admission,0,P$ENTITYNUMBER
WAKE RR_InputBuffer,-1,P$ENTITYNUMBER
terminate_ve
endif
timeout RR_EntryTimeout,0,P$ENTITYNUMBER
TERMINATE_VE
ENDPROCEDURE