DES Philosophy of the Railway Model

Updated: 2026-05-28

DES Philosophy of the Railway Model

The GPSS-Plus railway model does not simulate the continuous movement of trains.

It simulates only the temporal validity of movement authorizations.

This difference is fundamental.

In a classic imperative engine, the system normally:

  • continuously checks positions,

  • detects collisions,

  • evaluates distances,

  • and recalculates states on every cycle.

In this model, there is no global network scan.

The CTC does not "monitor" trains.

Nor do trains constantly ask whether they can move forward.

All the logic is based exclusively on discrete events that invalidate the system's previous state.

State changes only when an event occurs

As long as nothing changes:

  • no calculations are necessary,

  • no block is reevaluated,

  • and no train consumes additional CPU resources.

The system remains stable until one of the following events occurs:

  • a train enters a new block,

  • a reservation becomes invalid,

  • a switch must be changed,

  • or telemetry changes the global state of permissions.

Only then does the CTC compute again.

Telemetry as a mechanism of causality

Telemetry is not a visual or statistical mechanism.

It is the causal trigger of the algorithm.

The CTC only knows the state of the network through events emitted by the trains themselves.

If a train does not report:

  • the CTC does not release blocks,

  • reservations remain active,

  • and the system retains the last known valid state.

Therefore, network consistency emerges from the exchange of events rather than from continuous supervision.

Predictive reservation instead of continuous control

The system does not physically control train operation either.

The CTC only grants or denies future occupancy windows.

Each train:

  • receives permissions,

  • updates its state machine,

  • and locally resolves its kinematic behavior.

The algorithm does not calculate trajectories step by step.

It calculates when an authorization ceases to be valid.

Fundamental principle

The engine does not simulate train operation.

It simulates changes in the validity of occupancy permissions.